Nuclear Power Plant news pg. 2627
Information on NPP Temelín 2/2006
The first and the second Units are operated at a planned power level. All auxiliary systems are working in accordance with the operation needs of individual units.This evening, Unit 2 of the Temelín power plant will be shut down as planned.
3. 1. 2006
Information on NPP Temelín 1/2006
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.