JE Temelin traffic

Information on NPP Temelín 246/2005

Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.

20. 12. 2005

JE Temelin traffic

Information on NPP Temelín 245/2005

Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.

19. 12. 2005

JE Temelin traffic

Information on NPP Temelín 244/2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

16. 12. 2005

JE Temelin traffic

Information on NPP Temelín 242 / 2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

15. 12. 2005