Nuclear Power Plant news pg. 2629
Information on NPP Temelín 246/2005
Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.
20. 12. 2005
Information on NPP Temelín 245/2005
Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.