We provide electricity distribution for our customers within the meaning of Act No. 458/2000 Sb.
HEAD OF VÍTKOVICE ELECTRICITY DISTRIBUTION
Mobile: +420 737 765 709
E-mail: zdenek.flagar@cez.cz
Transmission capacity in the defined area [MW] | ||
---|---|---|
376 | ||
Voltage level [kV] | Cable distribution length [km] | Distribution type |
0,400 | 10,000 | Cable |
0,500 | 15,000 | Cable |
5,000 | 25,000 | Cable |
6,000 | 26,000 | Cable |
22,000 | 70,000 | Cable |
Transformer station | ||
Input voltage [kV] | Output voltage [kV] | Number |
5,000 | 0,400 | 3 |
6,000 | 0,400 | 3 |
22,000 | 5,000 | 3 |
22,000 | 6,000 | 4 |
110,000 | 22,000 | 3 |
Cadastral territory | Cadastre code | Area |
Moravská Ostrava | 713520 | Ostrava |
Mariánské Hory | 713830 | Ostrava |
Nová Ves u Ostravy | 713937 | Ostrava |
Zábřeh-Hulváky | 713970 | Ostrava |
Vítkovice | 714071 | Ostrava |
Zábřeh-VŽ | 714089 | Ostrava |
Hrabůvka | 714585 | Ostrava |
The name of the investment project | Year of implementation | |
---|---|---|
1 | Replacement of transformer T15 to R8/II including power supply substations | 2021 |
2 | Reconstruction of 22kV substation No. 5,6 at R8/II | 2021 |
3 | Reconstruction of part of the LV distribution network connected from R8/VI | 2021 |
4 | Replacement of TL1 choke on R8/II | 2022 |
5 | Replacement, reconstruction of part of the cable connection 5, 22kV, R8/II – R15/I – R5/II | 2022 |
6 | Reconstruction of R15/I substation | 2022 - 2023 |
7 | Reconstruction – relocation of K11 substation | 2023 |
8 | Reconstruction of substation No. 3, 22kV – primary side T2, at R2/I | 2023 |
9 | Reconstruction of substation No. 316, 6kV – secondary side of T2, at R2/I | 2023 |
10 | Reconstruction – extension of MV distribution lines fed from R15/Ia | 2023 - 2024 |
11 | Reconstruction of R3/V substation – MV and LV | 2024 |
12 | Replacement of TL1, TL2, TL3 chokes at R8/III (change of current control range) | 2024 |
13 | Replacement of T3 22/6kV transformer to R2/I | 2024 |
14 | Replacement (relocation to the power bridge) of cable connection No.5,6 22kV R8/III – R2/I | 2025 |
15 | Addition of switching element status signaling at R2/V to MKD | 2025 |
16 | Replacement of transformer T16 to R8/II including power supply substations | 2025 |
17 | Reconstruction of the power cable connection – R3/I | 2025 |
Document | Type | Size |
---|---|---|
Annual operation preparation 2017 | 807 kB | |
Annual operation preparation 2018 | 774 kB | |
Annual operation preparation 2019 | 522 kB | |
Annual operation preparation 2020 | 487 kB | |
Annual operation preparation 2021 | 395 kB |