You must enable JavaScript to ensure proper functioning of the website.
EN
CZ
Our services
References
About us
Documents for download
Contacts
Back
Our services
Construction and renovation of energy facilities
Construction and operation of public lighting
Distribution equipment operation
Energy management operation
Water management laboratory
Comprehensive services in the field of occupational health and safety (OHS)
About us
Company profile
Company management
Certification
GDPR
EN
Back
CZ
Dolní Benešov foundry
Subject of realization
Installation of new high voltage cable distribution, including cable trays to the new TR4 substation
Supply of a new 1.25 MVA dry-type transformer and supply of a new low-voltage power switchboard, including compensation
Construction modifications in the TR4 room and construction of a transformer stand, including air conditioning to ventilate the transformer room
Renovation of low voltage cable connections and connection to a new LV RH switchboard
Installation of the USM measuring box in the MV TR2 substation for measuring electricity consumption at the HV level
Turnkey construction, including functional tests, commissioning, implementation project documentation and documentation of the actual construction
Benefits of implementation
Measurement of electricity consumption from LV level to HV level
Renovation of the transformer station and renovation of the LV switchboard (reliability of electricity supply, reliability of new equipment)
Generation expansion and construction of a new high-voltage switching station In the future
Term of realization
2014