Reconstruction that will ensure a trouble-free supply of electricity during the operation of the metro at the Budějovická station
The work associated with the replacement of part of the 22 kV power cables from the Kačerov and Pankrác stations in the metro tunnels was particularly demanding, mainly because these works could only be carried out at night when the metro was closed. All other work was carried out at full metro operation.