You must enable JavaScript to ensure proper functioning of the website.
EN
CZ
Our services
References
About us
Documents for download
Contacts
Back
Our services
Construction and renovation of energy facilities
Construction and operation of public lighting
Distribution equipment operation
Energy management operation
Water management laboratory
Comprehensive services in the field of occupational health and safety (OHS)
About us
Company profile
Company management
Certification
GDPR
EN
Back
CZ
Heating replacement in the central electric boiler room by local gas heat sources
Boiler room before renovation
Basic information about the grid
1 electric boiler room, installed power input of 1,170 kW
3 electric boilers, each with an installed input of 390 kW
Costs of heat supply before renovation
Approx. CZK 1.9 mil. per year
Costs and benefits of renovation
Investment costs of CZK 2,395 thousand
Object 1—2 gas boilers of 35 kW
Object 2—2 gas boilers of 35 kW
Object 3—2 gas boilers of 45 kW
Reduction of heat supply costs by czk 1 million per year
53% reduction in heating costs
The renovation was carried out in the autumn of 2012 and included
Dismantling existing sources in the electric boiler room
Renovating distributions to existing distributors
Constructing a new gas pipeline connection and new gas distribution to individual buildings
Installation of 6 VITODENS boilers (with outputs of 35 to 45 kW)
Completion and handover in January 2013
Before renovation
After renovation