16. 10. 2024

INFORMATION ON NPP TEMELÍN 200 / 2024

Unit 1 is in the operation. Unit 2 is in the planned outage for refuelling. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1086 MWe
  • Electricity production since the beginning of the year: 5 454 905 MWh

 

Information on parameters at Unit 2:

  • Unit is in the outage
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 6 882 762 MWh