8. 12. 2006

Informacion on Dukovany, December 8th 2006

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 265 010 143 MWh.

Information on parameters of Unit 1-4, today on December 8th, 2006 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 451 MWe

 

Unit 2 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 448 MWe

 

Unit 3 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 466 MWe

 

Unit 4 is in Mode 7 – total fuel removal from reactor core

 

 

Electricity production since the beginning of the year: 13 238 407 MWh.