9. 8. 2007

Information on Dukovany NPP, August 9th 2007

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 274 472 340 MWh.

Information on parameters of Unit 1-4, today on August 9th 2007 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 438 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 437 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 448 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 442 MWe

 

 

 

Electricity production since the beginning of the year: 8 675 183 MWh.