8. 12. 2008

Information on Dukovany NPP, December 8th 2008

Units 1, 2 a 3 are operated at full rated power. Unit 4 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 293 117 300 MWh.

Information on parameters of Unit 1-4, today on December 8h 2008 at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 469 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 459 MWe

Unit 4 is in Mode 2 – Startup-criticality achieving and reactor critical

 

Electricity production since the beginning of the year: 13 413 000 MWh.