Information on parameters of Unit 1-4, today on December 8h 2008 at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 469 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 459 MWe
Unit 4 is in Mode 2 – Startup-criticality achieving and reactor critical
Electricity production since the beginning of the year: 13 413 000 MWh.