Information on parameters of Unit 1-4, today on February 21st 2008at7:00hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 468 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 97 %, Turbine generator output – 438 MWe
Unit 3 is in Mode 2 – startup-criticality achieving and reactor critical
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 458 MWe
Electricity production since the beginning of the year: 2 020 084 MWh.