22. 2. 2007

Information on Dukovany NPP, February 22nd 2007

Units 1,2,4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 267 738 049 MWh.

Information on parameters of Unit 1-4, today on February 22nd 2007 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 450 MWe

 

Unit 2 is in Mode 1 – power conditions: Reactor power is 96%, Turbine generator output – 426 MWe

 

Unit 3 is in Mode 6 – refueling – shutdown with primary circuit open

 

Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 468 MWe

 

 

 

 

Electricity production since the beginning of the year: 1 940 892 MWh.