6. 2. 2008

Information on Dukovany NPP, February 6th 2008

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 281 227 998 MWh.

Information on parameters of Unit 1-4, today on  February 6th 2008 at 7:00hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 469 MWe

Unit 2is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 445 MWe

Unit 3is in Mode 6 – refueling – shutdown with primary circuit open

Unit 4is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe

 

Electricity production since the beginning of the year: 1 523 698 MWh.