23. 1. 2007

Information on Dukovany NPP, January 23rd 2007

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 266 643 869 MWh.

Information on parameters of Unit 1-4, today on January 23rd 2007 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 45 MWe

 

Unit 2 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output – 447 MWe

 

Unit 3 is in Mode 1 – power conditions: Reactor power is 95,8%, Turbine generator output - 447 MWe

 

Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 469 MWe

 

 

 

 

Electricity production since the beginning of the year: 846 712 MWh.