Information on parameters of Unit 1-4, today on January 26th 2009 at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 460 MWe
Unit 3 is in Mode 7 – refueling until GO – R7
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe
Electricity production since the beginning of the year: 932 742 MWh.