26. 1. 2009

Information on Dukovany NPP, January 26th 2009

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 295 084 590 MWh.

 

Information on parameters of Unit 1-4, today on January 26th  2009 at 7:00 hrs:

 

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 460 MWe

Unit 3 is in Mode 7 – refueling until GO – R7

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe

 

Electricity production since the beginning of the year: 932 742 MWh.