Information on parameters of Unit 1-4, today on March 3rd 2008 at 7:00hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe
Unit 2is in Mode 1 – power conditions: Reactor power is 91,5 %, Turbine generator output – 403 MWe
Unit 3is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe
Unit 4is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 468 MWe
Electricity production since the beginning of the year: 2 471 541 MWh.