Information on parameters of Unit 1-4, today on May 5th 2008 at 7:00hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 462 MWe
Unit 2 is in Mode 5 – cold shutdown
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe
Electricity production since the beginning of the year: 4 634 008 MWh.