26. 11. 2007

Information on Dukovany NPP, November 26th 2007

Units 1, 2, 3 are operated at full rated power. Unit 4 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 278 464 764 MWh.

Information on parameters of Unit 1-4, today on  November 26th 2007at 7:00hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 470 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 445 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe

Unit 4 is in Mode 6 – refueling – shutdown with primary circuit open

 

Electricity production since the beginning of the year: 12 667 607 MWh.