Information on parameters of Unit 1-4, today on November 5th 2007at 7:00hrs:
Unit 1 is in Mode 6 – refueling – shutdown with primary circuit open
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 432 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 462 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 96 %, Turbine generator output - 446 MWe
Electricity production since the beginning of the year: 11 859 231 MWh.