Information on parameters of Unit 1-4, today on October 20th 2008 at 7:00 hrs:
Unit 1 is in Mode 6 – refueling – shutdown with primary circuit open
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 464 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 462 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 97,7 %, Turbine generator output – 457 MWe
Electricity production since the beginning of the year: 11 747 107 MWh.