Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 289 523 088 MWh.
Information on parameters of Unit 1-4, today on September 4th 2008 at 7:00 hrs:
Unit 1 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 455 MWe
Unit 2 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 453 MWe
Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 454 MWe
Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 457 MWe
Electricity production since the beginning of the year: 9 818 788 MWh.