Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 462 MWe
Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output - 459 MWe
Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 464 MWe
Electricity production since the beginning of the year: 5 426 072 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany