3. 4. 2009

Information on NPP Dukovany 03/04/2009

Units 1, 2, 4 are operated at full rated power. Unit 3 startup after Unit modernisation. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 297 334 875 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 464 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is  99 %, Turbine generator output – 459 MWe

Unit 3 is in Mode 1 – startup after Unit modernisation: Reactor power is 17,7%, Turbine generator

output – 0 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 470 MWe

 

 Electricity production since the beginning of the year:  3 183 027 MWh.

 

Ing. Petr Spilka

Spokesman of the ČEZ Group

Nuclear Power Plant Dukovany