Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 464 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 99 %, Turbine generator output – 459 MWe
Unit 3 is in Mode 1 – startup after Unit modernisation: Reactor power is 17,7%, Turbine generator
output – 0 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 470 MWe
Electricity production since the beginning of the year: 3 183 027 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany