Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 454 MWe
Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output - 452 MWe
Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 490 MWe
Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %, Turbine generator output - 454 MWe
Electricity production since the beginning of the year: 9 542 980 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany