Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe
Unit 2 is in Mode 1 - The Unit is in a startup mode after refuelling, Reaktor power is 78%,
Turbine generator output – 324 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 501 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 464 MWe
Electricity production since the beginning of the year: 4 195 132 MWh.
ng. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany