Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 461 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 96 %, Turbine generator output – 446 MWe
Unit 3 is in Mode 1 – startup after Unit modernisation: Reactor power is 29 %, Turbine generator output – 98 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 448 MWe
Electricity production since the beginning of the year: 3 386 963 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany