Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 - power conditions: Reactor power is 98,6 %,
- Turbine generator output - 455 MWe
- Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %,
- Turbine generator output - 459 MWe
- Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %,
- Turbine generator output - 497 MWe
- Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %,
- Turbine generator output - 461 MWe
Electricity production since the beginning of the year: 10 035 315 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany