20. 12. 2021

INFORMATION ON NPP DUKOVANY 20/12/2021

Units 1, 3, 4 are operated on power operation. Unit 2 is in planned outage. Electricity production since the beginning of the operation: 476 438 143 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 2 is in Mode 6 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
 

Electricity production since the beginning of the year: 14 438 143 MWh.