1. 4. 2022

INFORMATION ON NPP DUKOVANY 01/04/2022

Units 2, 3, 4 are in the operation. Unit 1 is in planned outage. Electricity production since the beginning of the operation: 480 353 132 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 4 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
 

Electricity production since the beginning of the year: 3 303 579 MWh.