20. 4. 2022

INFORMATION ON NPP DUKOVANY 20/04/2022

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 481 194 700 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 501 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
 

Electricity production since the beginning of the year: 4 145 146 MWh.