19. 7. 2022

INFORMATION ON NPP DUKOVANY 19/7/2022

Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 484 854 661 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 482 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 478 MWe
Unit 4 is in Mode 4 - outage

Electricity production since the beginning of the year: 7 805 107 MWh.