10. 10. 2022

Information on NPP DUKOVANY 10/10/2022

Units 1, 2, 4 are in the operation. The Unit 3 is in the outage for refueling. Electricity production since the beginning of the operation: 488 479 168 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
Unit 3 is in Mode 6 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 501 MWe

 

Electricity production since the beginning of the year: 11 429 614 MWh.