1. 11. 2022

Information on NPP DUKOVANY 1/11/2022

Units 1, 4 are in the operation. The Unit 2 is in the startup mode. The Unit 3 is in the outage. Electricity production since the beginning of the operation: 489 065 276MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 489 MWe
Unit 2 is in Mode 1 - startup mode, Reactor power is 20 %, Turbine generator output - 60 MWe
Unit 3 is in Mode 6 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe

 

Electricity production since the beginning of the year: 12 015 722 MWh.