24. 2. 2023

Information on NPP DUKOVANY 24/2/2023

Units 1, 3 and 4 are in the operation. The Unit 2 is in planned outage. Electricity production since the beginning of the operation: 494 198 302 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
Unit 2 is in Mode 7 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe

 

Electricity production since the beginning of the year: 2 421 478 MWh.