Information on NPP DUKOVANY 15/11/2023

Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 504 455 031 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 496 MWe
Unit 4 is in Mode 7 - outage

Electricity production since the beginning of the year: 12 678 200 MWh.