26. 2. 2024

Information on NPP DUKOVANY 26/2/2024

Units 1, 2, 4 are in the operation. Unit 3 is in planned outage. Electricity production since the beginning of the operation: 508 329 917 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 3 is in Mode 7 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 505 MWe

Electricity production since the beginning of the year: 2 225 818 MWh.