3. 7. 2023

Information on NPP DUKOVANY 3/7/2023

Units 3, 4 are in the operation. Units 1, 2 are in the planned outages. Electricity production since the beginning of the operation: 499 288 090 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 7 - outage
Unit 2 is in Mode 6 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 491 MWe

 

Electricity production since the beginning of the year: 7 511 259 MWh.