1. 9. 2023

Information on NPP DUKOVANY 1/9/2023

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 501 365 041 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 4 is in Mode 1 - stable operation on thermal and power effect, Reactor power is 99 %, Turbine generator output - 488 MWe

Electricity production since the beginning of the year: 9 588 211 MWh.