Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 459 MWe
Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 453 MWe
Unit 3 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 498 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 460 MWe
Electricity production since the beginning of the year: 4 841 836 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany