Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 470 MWe
- Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 465 MWe
- Unit 3 is in Mode 1 - power conditions, Reaktor power is 96,4 %, Turbine generator output – 483 MWe
- Unit 4 is in Mode 1 - power conditions, Reactor power is 100 %, Turbine generator output – 468 MWe
Electricity production since the beginning of the year: 2 292 120 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany