22. 12. 2009

Information on NPP Dukovany 22/12/2009

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 307 662 872 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 1 - power conditions, Reaktor power is  53 %, Turbine generator output – 205 MWe
  • Unit 2 is in Mode 1 - power conditions, Reaktor power is  53 %, Turbine generator output – 200 MWe
  • Unit 3 is in Mode 1 - power conditions, Reactor power is 100 %, Turbine generator output – 488 MWe
  • Unit 4 is in Mode 1 - power conditions, Reactor power is 100 %, Turbine generator output – 460 MWe

 

Electricity production since the beginning of the year:  13 511 024 MWh.

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany