Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 470 MWe
Unit 2 is in Mode 6 – refueling – shutdown with primary circuit open
Unit 3 is in Mode 1 – startup after Unit modernisation: Reactor power is 49 %, Turbine generator output – 236 MWe
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 468 MWe
Electricity production since the beginning of the year: 3 831 727 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany