Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 297 201 019 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe
Unit 3 is in Mode 4 - hot shutdown
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 459 MWe
Electricity production since the beginning of the year: 3 049 171 MWh.