30. 4. 2009

Information on NPP Dukovany 30/04/2009

Units 1, 3, 4 are operated at full rated power. Unit 2 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 298 181 676 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 452 MWe

Unit 2 is in Mode 4 - hot shutdown

Unit 3 is in Mode 1 – startup after Unit modernisation: Reactor power is 97,1 %, Turbine generator output – 479 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 466 MWe

 

Electricity production since the beginning of the year:  4 029 828 MWh.

 

Ing. Petr Spilka

Spokesman of the ČEZ Group

Nuclear Power Plant Dukovany