30. 9. 2009

Information on NPP Dukovany 30/09/2009

Units 2, 3, 4 are operated at full rated power. Unit 1 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 304 774 949 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 6 - refueling – shutdown with primary circuit open
  • Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %,Turbine generator output - 461 MWe
  • Unit 3 is in Mode 1 - power conditions: Reactor power is 100 %,Turbine generator output - 495 MWe
  • Unit 4 is in Mode 1 - power conditions: Reactor power is 100 %,Turbine generator output - 460 MWe

 

 Electricity production since the beginning of the year:  10 623 101 MWh.

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany