Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 465 MWe
- Unit 2is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 458 MWe
- Unit 3is in Mode 4 – hot shutdown
- Unit 4 is in Mode 1 - power conditions, Reactor power is 100 %, Turbine generator output – 450 MWe
Electricity production since the beginning of the year: 3 560 783MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany