Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 – power conditions, Reaktor power is 100 %, Turbine generator output – 459 MWe
- Unit 2 is in Mode 5 – cold shutdown
- Unit 3 is in Mode 1 – power conditions, Reaktor power is 99,9 %, Turbine generator output – 494 MWe
- Unit 4 is in Mode 1 – power conditions, Reactor power is 100 %, Turbine generator output – 461 MWe
Electricity production since the beginning of the year: 4 852 536 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany