2. 1. 2007

Information on NPP Temelín 1/2007

Both Unit 1 and 2 are in operation at full rated power.

January 2, 2007

All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on January 2, 2007 at 06:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 975 MWe
· Electricity production since the beginning of the year: 23 403 MWh

Information on parameters at Unit 2 today on January 2, 2007 at 06:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output – 1010 MWe
· Electricity production since the beginning of the year: 24 301 MWh

Milan Nebesář
Spokesman of the Temelín NPP