25. 5. 2006
Information on NPP Temelín 101/2006
Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 975 MW
· Electricity production since the beginning of the year: 3 258 050 MWh Information on parameters at Unit 2 today on May 25, 2006 at 07:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 977 MW
· Electricity production since the beginning of the year: 2 645 456 MWh Milan Nebesář
Spokesman of the Temelín NPP