1. 6. 2021

INFORMATION ON NPP TEMELÍN 105 / 2021

Both Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1089 MWe
  • Electricity production since the beginning of the year: 2 421 505 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1084 MWe
  • Electricity production since the beginning of the year: 3 977 936 MWh